Effluent Treatment Plants
Waste Water Treatment Plants
Sewage Treatment Plants
Biogas Recovery and Water Recycling
Solid Waste Management
Marine Outfall and Intake Systems
New Technology
Contact Us
Home




Common Effluent Treatment Plant
Overall View Of Waste Water Treatment Plant

This Waste Water Treatment Plant for treatment of effluents and Sewage generated by industrial units and housing colonies in Patalganga MIDC industrial area was conceived as a joint effort between Maharashtra Industrial Development Corporation, Patalganga and Rasayani Industries Association and Maharashtra Pollution Control Board.

It was decided to set up a public limited company for implementation of the WWTP. Hydroair Tectonics (PCD) Ltd. was selected as a Joint Venture Partner and a Joint Venture company named PRIA CETP (I) Ltd. was formed for implementation of this project. The project was completed through active cooperation from officials of MPCB & MIDC.




CETP in Patalganga MIDC industrial area

Overall View of ROHA CETP Overall View of ROHA CETP


1. Scheme approved by IIT, Mumbai.
2. Additional benefit of generation of biogas which will be used to generate power and thus reduce the power consumption.
3. Higher loading rates due to anaerobic system and thus smaller unit sizes leading to saving in capital cost.
4. Sludge handling by mechanical means : Filter press, Dewatered sludge will be stored temporarily and transported to Government approved designated site.
5. Minimal chemical consumption.
6. In tune with present Government policy of sustainable development and not limited to meeting discharge standards.


PRIMARY TREATMENT : Equalisation
: Neutralisation.
: Flash mixing for chemical dosing
: Clariflocculatio
n
SECONDARY TREATMENT
: Anaerobic based on UASB (Upflow
Anaerobic Sludge Blanket) process
: Anaerobic polishing step with inbuilt
settling.
SLUDGE HANDLING : By mechanical means:Automatic Belt
Filter Press.
: Dewatered sludge will be stored
temporarily and transported to
Government approved designed site.
BIOGAS UTILISATION : By Dual Fuel Engine.

WWTP AT AGLANCE

LOCATION : Plot No. P 58, MIDC Industrial Area,
Patalganga, Dist. Raigad, Maharashtra.

TREATMENT CAPACITY : 52,000 m3/day

LAND : 65,000 m2

POWER GENERATION : 1200 KVA
FROM ANAEROBIC
PROCESS

DISPOSAL : Treated waste water will be disposed in
saline zone of Patalganga River through
pipeline.



1. One of the Largest WWTP : 52 MLD Capacity

2. Bio - Methnation by : First time in Maharashtra
Upflow Anaerobic Sludge for WWTP
Blanket Process (UASB)

3. Power Generation Potential : 1200 KVA which meets 50 %of
the power requirement

4. Chemical Consumption : Lowest in this form of
treatment

INAUGURATION OF PRIA (WWTP) BY SHRI. SUSHILKUMARJI SHINDE,
HON. CHIEF MINISTER, MAHARASHTRA




Click here to View Process Flow Diagram (PRIA)


Home || About Us || Clientele || Achievements & Awards || Contact Us || What's New || Careers