|
LOCATION : Plot No. P 58, MIDC Industrial Area, Patalganga, Dist. Raigad, Maharashtra.
TREATMENT
CAPACITY : 52,000 m3/day
LAND
: 65,000 m2
POWER
GENERATION : 1200 KVA
FROM ANAEROBIC
PROCESS
DISPOSAL
: Treated waste water will be disposed in
saline zone of Patalganga River through
pipeline.
|
|
1. One of the Largest WWTP : 52 MLD Capacity
2.
Bio - Methnation by : First time in Maharashtra
Upflow Anaerobic Sludge for WWTP
Blanket Process (UASB)
3.
Power Generation Potential : 1200 KVA which
meets 50 %of
the power requirement
4.
Chemical Consumption : Lowest in this form
of
treatment
|