Pollution Control with Profit for 30 KLD Distillery
By Anaerobic Process using UASB

Power
Consumption, O&M, Recovery as Fuel and Cost-Benefit Analysis*
Capital
Cost of the Plant = Rs. 1,20,00,000 /- p.a.
Total Saving Due To Power Generation = Rs. 2,70,95,040 /-
Payback Period = 0.51 years ~ 6 months
Design
Data
| Title |
Inlet |
Outlet |
Flow |
450m3
/ Day |
450m3
/ Day |
pH |
4.5 |
5.5
- 9.0 |
BOD |
40000-50000
mg/L |
<
100 mg/l |
COD |
90000-120000
mg/L |
<
100 mg/l |
Suspended
Solids |
3000
mg/L |
<
100 mg/l
|
ADVANTAGE
:-
• Biogas Generations
= 15360m3/day
• Costing the Plant can be Recovered in Just 6 Months.
• Minimum Operation & Maintenance Cost
• No External Power Requirement for ETP.
SALIENT FEATURES
:
• COD Reduction
:- 60 - 65%
• Gas Generated :- 0.5 to 0.55 m3 biogas per kg COD destroyed
• Anaerobic process thus oxygen from external source not required
and no limitation of a transfer of oxygen which is sparingly soluble.
• Practically no power requirement since no internal mixing /aeration
required.
• Generation of methane rich biogas which can be used to generate
power
• Minimal sludge production due to higher sludge retention time