Pollution Control with Profit for
30 KLD Distillery
By Anaerobic Process using UASB

 

Flow Chart

Power Consumption, O&M, Recovery as Fuel and Cost-Benefit Analysis*

 
 
Capital Cost of  the Plant                        =  Rs. 1,20,00,000 /- p.a.
Total Saving Due To Power Generation     =  Rs. 2,70,95,040 /-
Payback Period                                      =  0.51 years ~ 6 months
 

DESIGN DATA

 

Title

Inlet

Outlet

Flow

450m3 / Day

450m3 / Day

pH

4.5

5.5 - 9.0

BOD

40000-50000 mg/L

< 100 mg/l

COD

90000-120000 mg/L

< 100 mg/l

Suspended Solids

3000 mg/L

< 100 mg/l

ADVANTAGE :-

  • Biogas Generations = 15360m3/day
  • Costing the Plant can be Recovered in Just 6 Months.
  • Minimum Operation & Maintenance Cost
  • No External Power Requirement for ETP.

 

SALIENT FEATURES :-

  • COD Reduction :- 60 - 65%
  • Gas Generated :- 0.5 to 0.55 m3 biogas per kg COD destroyed
  • Anaerobic process thus oxygen from external source not required and no limitation of a transfer of oxygen which is sparingly soluble.
  • Practically no power requirement since no internal mixing /aeration required.
  • Generation of methane rich biogas which can be used to generate power
  • Minimal sludge production due to higher sludge retention time.